Rio Blanco Oil Shale Project.
Add this to your Mendeley library Report an error

Title

Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report :

Title Variants:

Alternative: Environmental baseline studies

Alternative: Environmental baseline studies

Alternative: Geotechnical data gathering project

Alternative: Geotechnical data gathering report

By











Genre

Journal

Publication info

Denver, Colo. :Rio Blanco Oil Shale Project,1976.

Subjects

Colorado , Environmental aspects , Environmental monitoring , Oil-shale industry , Rio Blanco County , Rio Blanco Oil Shale Project

Find in a local library

Title

Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report :

Title Variants:

Alternative: Environmental baseline studies

Alternative: Environmental baseline studies

Alternative: Geotechnical data gathering project

Alternative: Geotechnical data gathering report

By

Rio Blanco Oil Shale Project.

CDM/Limnetics.
Ecology Consultants, inc.
EG & G Environmental Consultants.
Gulf Oil Corporation.
Limnetics, Inc.
NUS Corporation. Ecological Sciences Division.
Rio Blanco Oil Shale Project.
Standard Oil Company (Ind.)
Wright Water Engineers.

Genre

Journal

Publication info

Denver, Colo. :Rio Blanco Oil Shale Project,1976.

Notes:

Title is derived from content, and imprint varies.

Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2.

Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals.

Title derived from content and imprint varies.

Title drived from contents and imprint varies.

Title drived from contents and the imprint varies.

Title derived from contents and imprint varies.

First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals.

Title derived from content, and imprint varies.

Title derived from contents, and imprint varies.

Subjects

Colorado , Environmental aspects , Environmental monitoring , Oil-shale industry , Rio Blanco County , Rio Blanco Oil Shale Project

Call Number

TN859.C64 R564 1976

Language

English

Identifiers:

OCLC: 15926383

Find in a local library

Download MODS

<mods xmlns:xlink="http://www.w3.org/1999/xlink" version="3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-0.xsd">
<titleInfo>
<title>Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.</title>
<partNumber> no.8, </partNumber>
<partName> Progress report : </partName>
</titleInfo>
<titleInfo type="alternative">
<title>Environmental baseline studies</title>
</titleInfo>
<titleInfo type="alternative">
<title>Environmental baseline studies</title>
</titleInfo>
<titleInfo type="alternative">
<title>Geotechnical data gathering project</title>
</titleInfo>
<titleInfo type="alternative">
<title>Geotechnical data gathering report</title>
</titleInfo>
<name type="corporate">
<namePart>Rio Blanco Oil Shale Project.</namePart>
</name>
<name type="corporate">
<namePart>CDM/Limnetics.</namePart>
</name>
<name type="corporate">
<namePart>Ecology Consultants, inc.</namePart>
</name>
<name type="corporate">
<namePart>EG &amp; G Environmental Consultants.</namePart>
</name>
<name type="corporate">
<namePart>Gulf Oil Corporation.</namePart>
</name>
<name type="corporate">
<namePart>Limnetics, Inc.</namePart>
</name>
<name type="corporate">
<namePart>NUS Corporation. Ecological Sciences Division.</namePart>
</name>
<name type="corporate">
<namePart>Rio Blanco Oil Shale Project.</namePart>
</name>
<name type="corporate">
<namePart>Standard Oil Company (Ind.)</namePart>
</name>
<name type="corporate">
<namePart>Wright Water Engineers.</namePart>
</name>
<typeOfResource>text</typeOfResource>
<genre authority="marcgt">series</genre>
<originInfo>
<place>
<placeTerm type="text">Denver, Colo. :</placeTerm>
</place>
<publisher>Rio Blanco Oil Shale Project,</publisher>
<dateIssued>1976.</dateIssued>
<dateIssued encoding="marc" point="start">1974</dateIssued>
<dateIssued encoding="marc" point="end">1977</dateIssued>
</originInfo>
<language>
<languageTerm authority="iso639-2b" type="text">English</languageTerm>
</language>
<note>Title is derived from content, and imprint varies.</note>
<note>Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2.</note>
<note type="numbering">Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals.</note>
<note>Title derived from content and imprint varies.</note>
<note>Title drived from contents and imprint varies.</note>
<note>Title drived from contents and the imprint varies.</note>
<note>Title derived from contents and imprint varies.</note>
<note type="numbering">First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals.</note>
<note>Title derived from content, and imprint varies.</note>
<note>Title derived from contents, and imprint varies.</note>
<subject>
<geographic>Colorado</geographic>
</subject>
<subject>
<topic>Environmental aspects</topic>
</subject>
<subject>
<topic>Environmental monitoring</topic>
</subject>
<subject>
<topic>Oil-shale industry</topic>
</subject>
<subject>
<geographic>Rio Blanco County</geographic>
</subject>
<subject>
<topic>Rio Blanco Oil Shale Project</topic>
</subject>
<classification authority="lcc">TN859.C64 R564 1976</classification>
<identifier type="uri">http://www.biodiversitylibrary.org/bibliography/59078</identifier>
<identifier type="oclc">15926383</identifier>
<recordInfo>
<recordContentSource authority="marcorg">OSK</recordContentSource>
</recordInfo>
</mods>

Download BibTeX citations

@book{bhl120774,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/120774},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {670},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120775,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/120775},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {496},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121338,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/121338},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {110},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121970,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/121970},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {576},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl122192,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/122192},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {800},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl122193,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/122193},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {842},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl122325,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/122325},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {1974},
pages = {604},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl122326,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
url = {http://www.biodiversitylibrary.org/item/122326},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {822},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121610,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/121610},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {372},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121613,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/121613},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {420},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121964,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/121964},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {724},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120772,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/120772},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {516},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120773,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/120773},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {340},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120720,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/120720},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {440},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120770,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {1},
url = {http://www.biodiversitylibrary.org/item/120770},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {574},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120721,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {2},
url = {http://www.biodiversitylibrary.org/item/120721},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {494},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121960,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {2},
url = {http://www.biodiversitylibrary.org/item/121960},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {334},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121961,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {2},
url = {http://www.biodiversitylibrary.org/item/121961},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {524},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121971,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {2},
url = {http://www.biodiversitylibrary.org/item/121971},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {370},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121979,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {2},
url = {http://www.biodiversitylibrary.org/item/121979},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {782},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121972,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {3},
url = {http://www.biodiversitylibrary.org/item/121972},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {384},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121805,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {3},
url = {http://www.biodiversitylibrary.org/item/121805},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {570},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl120771,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {3},
url = {http://www.biodiversitylibrary.org/item/120771},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {476},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121105,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {4},
url = {http://www.biodiversitylibrary.org/item/121105},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {1146},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl122048,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {4},
url = {http://www.biodiversitylibrary.org/item/122048},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {728},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

@book{bhl121969,
title = {Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project. no.8, Progress report : },
volume = {5},
url = {http://www.biodiversitylibrary.org/item/121969},
note = {http://www.biodiversitylibrary.org/bibliography/59078 --- Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.},
publisher = {Denver, Colo. :Rio Blanco Oil Shale Project,},
author = {Rio Blanco Oil Shale Project. and CDM/Limnetics. and Ecology Consultants, inc. and EG & G Environmental Consultants. and Gulf Oil Corporation. and Limnetics, Inc. and NUS Corporation. and Standard Oil Company (Ind.) and Wright Water Engineers.},
year = {},
pages = {420},
keywords = {Colorado|Environmental aspects|Environmental monitoring|Oil-shale industry|Rio Blanco County|Rio Blanco Oil Shale Project|},
}

Download EndNote citations

%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120774



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120775



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121338



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121970



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/122192



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/122193



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/122325



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/122326



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121610



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121613



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121964



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120772



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120773



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120720



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 1
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120770



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 2
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120721



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 2
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121960



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 2
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121961



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 2
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121971



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 2
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121979



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 3
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121972



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 3
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121805



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 3
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/120771



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 4
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121105



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 4
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/122048



%0 Serial
%A Rio Blanco Oil Shale Project.
%A CDM/Limnetics.
%A Ecology Consultants, inc.
%A EG & G Environmental Consultants.
%A Gulf Oil Corporation.
%A Limnetics, Inc.
%A NUS Corporation.
%A Standard Oil Company (Ind.)
%A Wright Water Engineers.
%D 1974
%T Rio Blanco Oil Shale Project. Tract C-a / [c]by Rio Blanco Oil Shale Project.
%B no.8, Progress report :
%C Denver, Colo. :
%I Rio Blanco Oil Shale Project,
%V 5
%! Rio Blanco Oil Shale Project.
%L TN859.C64 R564 1976
%K Colorado
%K Environmental aspects
%K Environmental monitoring
%K Oil-shale industry
%K Rio Blanco County
%K Rio Blanco Oil Shale Project
%G English
%Z Title is derived from content, and imprint varies. --- Section 1. geotechnical data gathering project includes : section 1.1 geologic program ; section 1.2 hydrologic program - section 2. environmental baseline data gathering project includes : section 2. --- Report number 1 covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; report number 2 covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content and imprint varies. --- Title drived from contents and imprint varies. --- Title drived from contents and the imprint varies. --- Title derived from contents and imprint varies. --- First report covers from the date of the lease to Tract C-a to Sept. 30, 1974 ; second report covers Oct. 1, 1974-Feb. 28, 1975 ; succeeding reports cover three month intervals. --- Title derived from content, and imprint varies. --- Title derived from contents, and imprint varies.
%U http://www.biodiversitylibrary.org/item/121969